Full Specification
Studio Apartments – 10 in total
- Located at Base Level 1 (ie ground floor)
- Total size – 54.7 sqm or 587 sqft
- Compact unit, comprising open plan kitchen/living/dining/bedroom area, with separate bathroom and 1 outside balcony (see unit plan).
- North-facing, with uninterrupted views of paddy fields and the Sahyadri Hills.
- Designed for the Ruby Residency 2 "Budget Buyer" – most economical in terms of design and price.
Plan
- Carpet area:
393.81 Sq.Ft.(36.6 Sg.M.) - Built up area:
428.24 Sq.Ft. (39.8 Sq.M.) - Super built up area:
587.4 Sq.Ft. (54.7 Sq.M.) - Apartment numbers:
8001-8010
- Sleeping: 11'8" x 12'
- Living / Pantry: 16'5" x 10'
- Laundry: 2'6" x 2'6"
- Toilet: 8'10" x 4'5"
- Sitout: 10'11" x 4'2"
Block floor plan
Property features
-
Bathrooms:
- Ceramic wall tiles up to 7ft
- Hindware fittings – Wall-mounted W.C.
- Oval wash basins
- Granite counters
- Premium Jaguar fittings
- Prince Plumbing
- Extractor Fan point
-
Flooring:
- Living Areas - Vitrified Tiling and Skirting
- Bathrooms/Balconies – Anti-Skid ceramic tiles
-
Wall finish:
- Internal Walls: Gypsum finish with emulsion paint
- External Walls: Weather coat Apex paint
-
Kitchen:
- Granite Platforms with SS sink and drain board
- Dado ceramic tiles 600mm above counter
- Aquaguard water filter point
- Extractor fan point
-
Doors/windows:
- Fibreglass bathroom doors
- Anodised Aluminium sliding doors and windows with mosquito screens
-
Electrical:
- 3-phase wiring
- Finolex cables
- Invertor point
- Anchor Roma Modular switches
- Geyser points in bathrooms
- A/C points in all living areas
- Built-In Internet/cable TV/Intercom
- Washing Machine Point
-
Other:
- Water recycling from Effluent Treatment Plants ETP
- Use of fly-ash Bricks for Construction
- Garbage Disposal Facilities
- Quake Resistant Structural Design
- Extensive Landscaping
Payment Plan
| 1 | At the time of booking | 10% | |
| 2 | Casting of plinth/foundations | 20% | |
| 3 | Casting of 1st Slab | 10% | |
| 4 | Casting of 2nd Slab | 10% | |
| 5 | Casting of 3rd Slab | 10% | |
| 6 | Casting of 4th Slab | 10% | |
| 7 | Casting of 5th Slab | 10% | |
| 8 | Time of plastering | 10% | |
| 9 | Time of plumbing & electricity | 5% | |
| 10 | Time of possession | 5% |
Associated Costs
-
Water & Electricity connection
- 50,000
-
Life-time Club House Membership
- 50,000
-
Stilt (covered) parking
- 1,50,000
-
Open Parking
- 25,000
-
Housing Co-operative charges (Maintenance etc)
- 1Rs sqft per month
-
Stamp Duty (% of Total Consideration)
- Approx 1%
-
Registration charges (% of Total Consideration)
- Approx 1%
Call now to discuss your needs
Call +91 9158182222
or +91 9158161616
Email info@bharatdevelopers.com